Taskforce Meeting #19 held 25 November 2021

Updated: Nov 29, 2021

N.B. The taskforce also met on 6 September but did not issue a statement following that meeting, although it is referenced here:


The latest (19th) meeting of the Hammersmith Bridge Taskforce was held on 25 November 2021. Issues discussed included the future of the proposed ferry service, the report into the strengthening works from Dr Steve Denton and the ongoing work on the business case.

At the last Taskforce on 6 September, members concluded that there was insufficient evidence upon which to make an informed decision about the future of the ferry. Since then, members have completed further work on the remaining options and reached a position where a well-evidenced decision could be made.

In light of the available evidence, the decision has been taken to cease work on the ferry at this time. It is not currently anticipated that the bridge will need to be closed often enough or for long enough for the ferry to remain a viable solution.

The Taskforce remains committed to working together to deliver the repairs required to allow the bridge to reopen to all users as soon as feasibly possible.

Dana Skelley, speaking on behalf of the Hammersmith Bridge Taskforce, said:

  • At yesterday’s meeting, the Taskforce was joined by Dr Steve Denton to discuss the report, which was commissioned by LBHF to assess the options for strengthening Hammersmith Bridge.

  • The strengthening works will enable the bridge to reopen to all users including motorists and the report indicates that the 2 engineering solutions under consideration by LBHF are viable solutions. Both seek to undertake the same physical engineering work, but the proposed method of delivery is different and therefore each has different advantages and disadvantages.

  • The Taskforce noted the ongoing work to deliver the business case for the repair and restoration of Hammersmith Bridge, which is a requirement for any project that requires government funding. We look forward to LBHF completing its business casework and for works to commence to restore this historic bridge for full use.

The meeting was chaired by Transport Minister Baroness Vere. Attendees included Project Director Dana Skelley and representatives from the London Borough of Hammersmith and Fulham (LBHF), the London Borough of Richmond upon Thames (LBRuT), the Greater London Authority (GLA), Transport for London (TfL), Department for Transport (DfT) and the Port of London Authority (PLA).


To see the original post click here


Note that now a year has passed, recent Statements have stopped referencing the date the taskforce was set up. The line... "The Hammersmith Bridge Taskforce was set up by the Department for Transport in September 2020... " has been dropped.

43 views0 comments